When Amber Rudd, the Secretary of State, announced the UK coal phase-out back in 2015, she said:
“in the next 10 years, it’s imperative that we get new gas-fired power stations built.”
This laid the ground for a new dash for gas: in the latest capacity market in February 2018, 10 large gas plants with a capacity of 12GW applied for 15-year contracts, and a further five with a capacity of 10GW are readying themselves to apply in future auctions. This means almost half of all Europe’s prospective large gas plants are planned for the UK. However, so far, not a single one has bid successfully for a capacity contract.
It now looks likely the UK can leapfrog a ‘gas bridge’ to transition directly to clean power generation.
This report answers the following questions:
- Are enough renewables being built to replace coal, without increasing gas generation?
- Is it possible to avoid building any large gas plants, or are they needed to fill in the gaps in wind and solar after coal plants have retired?
- Should we be concerned if new large gas plants are built? What about small peaking gas plants?
- What policy steps should the Government take?
No need for new large gas
The UK is on track to phase-out coal by 2025 and keep the lights on without building any new large gas plants
By the end of 2016, there were seven coal plants left to replace, with a combined capacity of 14GW.
Contracts to replace five of these have already been signed – half with interconnectors, battery and Demand Side Response (DSR) – the other half with fossil generation, mostly small peaking gas generators. This capacity comes online from 2018 to 2021.
Our analysis shows the remaining two coal plants – just 2,800MW of capacity – are likely to be replaced in a similar manner, without the need for any new large gas plants.
Renewables will completely replace coal by 2025
95% of the required renewables growth to replace coal is already contracted or under construction, the Government has promised ample additional funding for the remainder. Offshore wind will provide most of the growth from 2017 to 2025.

The new grid is unsuitable for large gas plants
The switch to a grid dominated by renewables means new capacity is only required to run infrequentlyAlready, the remaining coal plants do not operate very often (load factor averaged 19% in 2017).
Our analysis shows the replacements for coal will need to operate even less (just 3% load factor in 2025 on conservative assumptions). As coal closes, the existing gas fleet will supplant some of coal’s generation, and renewables will reduce the load further.
Gas use in the electricity system has already peaked
But its rate of decline is less certainThe UK Government is relying on growing electricity imports to help decarbonise the electricity system: interconnectors are forecast to supply 22% of electricity by 2025. If this doesn’t happen, existing gas would generate more, and carbon emissions would be ~ 70MT higher than BEIS’s current projections by the end of 2025. Under such a scenario the UK would struggle to meet its legally binding carbon budgets.
Even if electricity imports are lower than expected or demand is higher, the UK is still unlikely to need new gas plants – small distributed technology will fill the gap more cheaply. Faster renewables growth and improved energy efficiency mitigates these policy risks.

Recommendations
1. Unleash the potential of solar and onshore wind now.
Currently the lion’s share of the UK’s renewables growth to 2025 will come from offshore wind. A fast and cost-effective way to keep reducing gas emissions throughout the early 2020’s is a subsidy-free CFD auction for onshore wind and solar; both have short construction lead times, and significant existing planning consent. Onshore wind is demonstrably cheaper than UK electricity wholesale prices and with the UK’s first subsidy-free PV farm already commissioned, solar should be competitive too.
2. Do not bring forward policy measures to support new build large gas.
The lights will stay on after coal has been phased out – without new build large gas. On March 20th, Claire Perry MP announced a review of the Capacity Market – this review should not promote new build large gas.
3. Prevent excess emissions from small peaking gas.
Policy is needed to address the emissions from small peaking gas as poor market design may be artificially inflating running hours. The 450gCO2/kWh instantaneous limit proposed in the coal phase-out legislation should be extended to all new build generation with a thermal capacity of over 1MW, and subsequently to existing installations too. This will ensure small peaking gas is only used when absolutely necessary to support the grid.
4. Increase innovation funding for long term electricity storage technologies.
Longer-term electricity storage will be required to fill in for seasonal and multi-day lulls in renewables output if we are to phase-out gas from our electricity mix in the long term. While we welcome recent Government funding commitments in energy storage, we recommend the Government sets up an innovation fund to tackle long-term electricity storage specifically.
5. Mitigate the risk of a slower fall in gas use, and begin planning now for a gas phase-out.
Policy is needed immediately to mitigate the risk of a slower decline in gas use caused by: increasing demand; delayed or cancelled new-build nuclear projects; or a reduced volume of electricity imports. Longer term, the government should look at the role of seasonal energy storage and carbon capture and storage technology in reducing gas emissions to zero.
Authors Charles Moore, Phil MacDonald, Dave Jones
Graphics Wilf Lytton
Video (Rugeley Coal Plant / Carrington Gas Plant) Phil MacDonald